Providing professional, dependable pre- and post-contract quantity surveying services across Malaysia since 1997.
Formed in June 1997 (formerly known as Perunding SL), SLQS Consult Sdn Bhd was established to support expanding local infrastructure and building developments in Malaysia. We deliver thorough, accurate, and strategic financial control for major building projects.
Preparation of report pertaining to costs overall projected capital expenditure and return as well as cash flow projection for the proposed development.
Preparation of Preliminary Estimate based upon preliminary drawings to obtain indication of expenditure requires for such particular design.
This serves as a guide line in order that the design falls within the budgeted costing. Cost Plan would provide the client maximum return against the budgeted costs.
The preparation of Bills of Quantities is based on architectural and structural drawings for the purposes of competitive tendering.
Bills of Quantities would provide all tenderers the same interpretation of the extent of works required, the amount of materials to be ordered, programming of the works and site management, etc.
The preparation of tender document is for the purpose of competitive open tender or tender by invitation or for negotiated tender.
Pre-qualification to tender may be required in order to provide the owner better understanding of the Tenderers with regard to their experience, financial standing and management capabilities.
Preparation of Tender Report on all bona fide tenders received. The report would include detailed evaluation of tenderer’s rates and prices with particular reference to their accuracy, completion period and reasonableness of the tenders.
The preparation of all documents for purpose of signing by parties concerned and stamping prior to the execution of the contract. This is to bind the Contractor to fulfill the required obligations as set out. The Contract Document shall be formalized within 90 days from the date of Letter of Award.
Measurements and valuation of works executed on site for the purpose of monthly interim payments to the Contractor for works executed.
Where variation works required by the owner have to be executed, those works have to be measured, evaluated and added to the initial Contract Sums. Cost estimates on the variation works would be worked out and reported within one week.
The preparation of the detailed final settlement of building costs for the purpose of getting the Final Cost of the project.
The preparation of Schedule of Rates for the purpose of agreeing basic rates in order to cover for works not indicated but required to be done at a later stage.
Analyzing the construction cost of various elements in the project for purpose of planning future projects.
The nature of our work in the profession which includes project cost control, cost analysis, quotation, etc., gives us the advantage of being able to provide Contract Management as Managing Consultants.
47-storey service apartment & office building.
50-storey service apartment & office development.
326 units of 3-storey villa residences.
Semi-D Factory @ Klang.
2 blocks of high-rise service apartments @ Jalan Tun Razak.
3 blocks of modern service apartments @ OUG.
Condominium development featuring 1,296 units.
Commercial Development PJ 21 @ PJ.
Residential @ KL.
Residential Development @ Bukit Jalil.
SLQS Consult Sdn Bhd
75-2, Jalan 3/62A, Bandar Manjalara,
52200 Kuala Lumpur.
Tel: +(6)03-3181 1502
Email: slqscsb@gmail.com
Open in Google Maps